South Shore Regional Vocational

Technical High School

Document Library

MODULE 1: Eligibility Period

Statement of Interest

Enrollment Certification

Enrollment Data

Educational Profile Questionnaire

Facilities Master Plan

Tiered Focused Monitoring Report – Office of Language Acquisition

Tiered Focused Monitoring Report – Special Education & Civil Rights

NEASC Commission on Public Schools Focus Visit 2019

Initial Compliance Certification

Invitation to Eligibility Period

Chapter 74 Viability Documentation

Feasibility Study Agreement

MODULE 2: Forming the Team

School Building Committee Membership Confirmation

OPM RFS

Designer RFS

MODULE 3: Feasibility Study

Preliminary Design Program Submission 

Preferred Schematic Report Submission – Part 1

Preferred Schematic Report Submission – Part 2

MONTHLY REPORTS

Monthly Report – May 2024

Monthly Report – April 2024

Monthly Report – March 2024

Monthly Report – February 2024

Monthly Report – January 2024

Monthly Report – December 2023

Monthly Report – November 2023

Monthly Report – October 2023

Monthly Report – September 2023

Monthly Report – August 2023

Monthly Report – July 2023

Monthly Report – June 2023

Monthly Report – May 2023

Monthly Report – April 2023

Monthly Report – March 2023

Monthly Report – February 2023

PROJECT UPDATES

South Shore Tech’s School Building Committee voted at the December 14th Meeting to proceed with CM-at-Risk procurement for the project. The process was started by submitting a request for approval to the Inspector General’s office and receiving the approval on March 8, 2024. Public advertising for CM firms Pre-Qualifications (RFQ) was done on March 6 with responses due on March 27, followed by Request for Proposals (RFP) from the qualified firms and the interview process on May 9th & 10th. During deliberations on May 10th, Suffolk Construction was ranked as the #1 firm and contract negotiations were started.

While evaluating the options for enrollment and building, the project team has issued estimated Tax Impact Analysis for the different districts. This analysis is provied for comparison purposes ONLY and it will be updated and finalized at the end of schematic design.

A message from Superintendent Tom Hickey
To view the presentation without narration, click here

South Shore Tech, the selected designer, Drummey Rosane Anderson, Inc. (DRA), and the project team are in the midldle stages of the Feasibility Study. The first portion was spent on educational visioning and space planning, and  the first submission to the MSBA known as the PDP (Preliminary Design Program), was submitted in October, 2023. The next step in the feasibility study was the PSR (Preferred Schematic Report) submission, which was submitted in April 2024. After the PSR Submission the project went in front of the MSBA Board of Directors on April 26, 2024 and was formally voted through to proceed into Schematic Design. Following a more in-depth design and site development, the next submission that goes to the MSBA will be the Schematic Design Submission on August 29, 2024.

UPCOMING EVENTS

MOST RECENT EVENTS

Whitman Forum

June 8, 2024

QUESTIONS

CONTACT US
FAQs